State Construction Committee

from 17.07.2003 N 107) for acceptance of completed construction projects in operation during the period from October to May, subject to statutory construction time, allowed the postponement of execution of works on device with a soft top layer of the roof, work on landscaping, etc. for the period from June through September within one sezona.Takim manner, in areas where there are no territorial building codes, which would be The period of remediation, taking into account the above clarifications State Construction Committee of Russia, the author believes, can be guided by the provisions 03/01/2004-snip 87.Chto also makes this approach work in practice? The fact that depending on the location construction and the end of the construction site remediation can be transferred to the favorable climatic period.

But it is important to each object individually building approach, considering both its location and period of completion of construction work, and the presence of various instruments in their respective territories. Jorge Perez describes an additional similar source. The author also recommends that in the timing of reclamation projects focus on the nearest friendly Agrotechnical period following the point of commissioning. In this period of rehabilitation must be determined within that time period, which enables implement all planned activities (about the amount of work commensurate with their terms of performance as stated in the Resolution of the Federal soa from 15.12.2005 N F04-8956/2005 (17820-A81-23)). Continue to learn more with: Jorge Perez. Given the above, for example, in the Yamalo-Nenets Autonomous District, as a special order in this territory is not established, and Russian law prohibited commissioning of facilities without a reclamation of land for construction, the introduction of operation of facilities during the period from October to April without completion of the reclamation legitimate, but only if the transfer of these works for the coming spring and summer.