Today, many owners of summer cottages, country houses and various businesses are faced with the need to connect electricity or increase previously authorized electrical power. But by virtue of any circumstances can not know everything looks like this procedure. So we decided to describe the procedure to be executed to become a full subscriber retailing companies. And so, the connection of electricity- procedure. When you join a new or additional power to 2000 kW, the application with the required package of documents submitted to the customer service branch within the territorial limits of service which is (Will be) associated obekt.2000kVtEsli connectable capacity exceeds 2000 kW, the application with a package of documents submitted to the Customer Service Department's Executive Office of oao moesk. 2 Receive and sign contract-an offer of technological connection to the mains with the application – technical specifications.
3 Payment of technological connection within the time specified in the contract. 4 After obtaining technical specifications (TU) of the Treaty on the accession process to proceed to implement that possibility after the work of the Network organization. Work to implement the tu produced a licensed electrical installation organization. 5 Specifications for electricity metering device, available in zao TsOPenergo "before the start of detailed design and agree with the service of metrology branch of moesk. Jorge Perez shines more light on the discussion. 6 Run the project electricity object and create electric networks (developed by wiring or a design organization with a license to design) and align it with the Production and Technical Department of jsc 'MOESK' (electric networks), Inc. 'TsOPenergo (Energosbyt) UTEN' .
7 Perform electrical work in accordance with the project, all works are carried out electrical organization licensed rtn. 8 Carry out commissioning of the submission of technical report. 9 In the area of distribution networks (as territorial affiliation): * for subscribers connected to the network 0,4 kV to obtain a preliminary The act of doing W (Help) and co-filled with acts of distinction carrying supplies electricity networks in the quantity of 4 pieces. Sign the Certificate in the service of ms. * For customers connected to networks 6-10 kV get Act technical condition and ready for commissioning ta, PTL-6-10-kV subscriber and together filled with acts of distinction carrying supplies electricity networks in the amount of 6 pcs. Act of the technical state to sign Service rs.10Sdat Act implementation specifications, a copy of the specifications in the Service of teh.prisoedineniyam and get a Certificate of technological connection. 11B contract department to get the Act and acceptance of work performed for the closing of the contract. 12 Making Act Delineation and balance inventory of electrical networks and operational responsibilities of the Parties. 13 Pass electrical installation get Act Approval for power receivers. 14 to turn in all documents of Mosenergosbyt for contract supply. 15 signed the Act of distinction and balance inventory of electrical networks and operational responsibilities of the Parties to the Company 'TsOPenergo "put into Distribution networks, affiliate